Fulton County, GA vs Harris County, TX

Empirical side-by-side comparison of municipal building permit fees, plan review turnaround SLAs, and mandatory contractor bond requirements.

Ordinance Cost Variance Takeaway Based on $250k Valuation

Harris County base permit fees are 0% higher than Fulton County

Estimated base commercial permit fee for $250k construction valuation: Fulton County ($1665.00) vs Harris County ($1665.00).

Cost Delta +0%
Ordinance Metric Fulton County, GA Harris County, TX
Enforcing Department (AHJ) Fulton County Dept of Environment and Building Harris County Engineering Department & Houston Permitting Center
Base Commercial Permit Fee ($250k) $1665.00 $1665.00
Estimated Plan Review SLA 12 - 18 Business Days 10 - 15 Business Days
Mandatory Surety Bond Minimum $10,000 Georgia Commercial Contractor Bond $10,000 Right-of-Way & Commercial Contractor Surety Bond
COI General Liability Threshold $1.0M Liability $1.0M Liability
Regional Code Mandates Georgia State Minimum Standard Building Code. Requires 2024 IBC wind-load engineering compliance (110 mph design wind speed) and Harris County Floodplain Management Regulations Section 4.