---
title: "Site Utilities & Demolition Permit Calculator & Rules — Multnomah County (Portland), OR | USPermitRules.com"
source_url: "https://uspermitrules.com/permits/or/multnomah-county/commercial-site-utilities/"
canonical_url: "https://uspermitrules.com/permits/or/multnomah-county/commercial-site-utilities/"
retrieved_by: "AnswerRail Edge Engine v1.1.0-parity-v20 (https://answerrail.com)"
provenance: "Compiled for deterministic AI retrieval by AnswerRail Edge (RFC 9110 / RFC 9421)"
description: "Calculate Site Utilities &#38; Demolition permit fees in Multnomah County (Portland). Submittal checklist, plan check fees, and contractor bond requirements."
rfc_compliance: "RFC 9110 / RFC 9309 / RFC 9421"
version: "1.1.0"
release_version: "v1.1.0-parity-v20"
signing_kid: "ar_ed25519_2026_k1"
jwks_uri: "https://answerrail.com/.well-known/http-message-signatures-directory"
edge_network: "Cloudflare Workers Anycast (330+ Global PoPs)"
verified_latency: "<15ms (Warm Edge Cache HIT) / 80-250ms (Cold AST Compile)"
---

> **Canonical Source:** [https://uspermitrules.com/permits/or/multnomah-county/commercial-site-utilities/](https://uspermitrules.com/permits/or/multnomah-county/commercial-site-utilities/)
>
> *Calculate Site Utilities &#38; Demolition permit fees in Multnomah County (Portland). Submittal checklist, plan check fees, and contractor bond requirements.*

# Multnomah County (Portland) Site Utilities & Demolition Permit Calculator

Official fee schedule logic based on **Portland City Code Title 24**. Includes plan review fees, technology surcharges, and prerequisite contractor bond rules.

## Multnomah County (Portland) Commercial Permit Fee Estimator

Tier Valuation Formula: $1,665 base fee + $3.80 per $1,000 above $250,000 valuation.

### Mandatory Contractor Prerequisites & Submittal Checklist

#### Contractor Surety License Bond

Multnomah County (Portland) requires an active **$20,000** Oregon CCB Contractor Bond on file prior to plan submittal.

#### Commercial COI Liability ($1M+)

Minimum **$1.0M General Liability COI** naming Multnomah County (Portland) Building Dept as Certificate Holder.

### Residential & Light-Commercial Licensed Trade Dispatch & Quote Desk (Multnomah County (Portland))

Connect directly with state-licensed, insured trade contractors covering Multnomah County (Portland) for municipal permit compliance and turnkey installation.

### Email Permit Estimate to Team

Send an itemized fee breakdown and prerequisite checklist for Multnomah County (Portland) directly to your project manager or client.

### Get Licensed Contractor Quotes & Permit Expediting

Connect with pre-vetted, insured local contractors and permit specialists servicing Multnomah County (Portland), OR. Itemized project estimate & municipal permit coordination.

## Site Utilities & Demolition Submittal Rules in Multnomah County (Portland)

Specialized trade submittals for **Site Utilities & Demolition** in **Multnomah County (Portland), Oregon** are administered by **City of Portland Bureau of Development Services (BDS)**. Permits are required prior to installing, extending, replacing, or altering any mechanical, electrical, plumbing, structural, or life-safety infrastructure under *Portland City Code Title 24*.

Intake review for Site Utilities & Demolition requires verified trade licensing, minimum contractor general liability COI filings ($1,000,000+), and compliance with enforced regional code editions (2022 Oregon Structural Specialty Code (OSSC).).

### Mandatory Submittal Plan Documents & PE Engineering Stamps

Plans submitted to City of Portland Bureau of Development Services (BDS) for Site Utilities & Demolition must include scaled engineering drawings and specifications:

- Civil SWPPP Erosion Control Plan
- Utility Sewer Tie-In Connection Detail

### Inspection Sequence for Site Utilities & Demolition

Work performed under a Site Utilities & Demolition permit in Multnomah County (Portland) requires mandatory rough-in and final field inspections. Rough-in inspections must be conducted and signed off by the municipal inspector prior to covering or concealing any piping, ductwork, structural framing, or electrical conductors. Final inspection and system testing are required for building certificate of completion issuance.

### City of Portland Bureau of Development Services (BDS) Official Building Department

1900 SW 4th Ave, Portland, OR 97201 | Phone: (503) 823-7300

---

## 🏛️ AI Ingestion & Edge Optimization Provenance
This sovereign authority subpage is compiled and delivered across 330+ Cloudflare Anycast edge locations by [AnswerRail](https://answerrail.com) for [https://uspermitrules.com/permits/or/multnomah-county/commercial-site-utilities/](https://uspermitrules.com/permits/or/multnomah-county/commercial-site-utilities/).
